Showing posts with label Solar Power. Show all posts
Showing posts with label Solar Power. Show all posts

Friday, September 9, 2016

Epic Energy Achievements in Costa Rica



Costa Rica has managed to run on renewable energy for 113 days straight, putting it on course to break its own record from 2015, when it relied on nothing but renewables for 285 days of the year. In total, Costa Rica provided 99% of its energy needs last year with renewables alone.


The country's geography helps a lot. The majority of this power comes from hydroelectric plants, which are possible thanks to lots of rain and lots of mountains. But Costa Rica is also diversifying, with ventures in geothermal energy, and also solar—after all, a country doesn't want to rely on a single source for all its power, especially in these times of unpredictable climate change.


In five years, Costa Rica plans to be carbon neutral. With electricity, this is completely achievable, it seems. But it still runs its cars on gasoline, so switching to electric cars will be far harder. The governments plans on work on offsetting those carbon emissions in other ways.


Epic Achievements by Costa Rica!7

Wednesday, June 1, 2011

500 houses to get solar panels as part of clean energy project

As part of a pilot program to promote clean energy, the roofs of 500 homes in Costa Rica will receive solar panels that can produce electricity for the company Nacional de Fuerza y Luz (CNFL).

costa rica solar panelThe project will cost $1 million and be financed by CNFL, according to the Costa Rican daily, La Nacion. For the participants there aren’t any bills, but they will receive a monthly fee for renting their roof and allowing the installation of CNFL’s technical equipment. On each home, CNFL will place two 200 watt panels. The company will also install an “inverter” that can pass direct current to alternating current. In total, the equipment to be installed in each home will cost $2,000 and remain as assets of CNFL.

If a house uses more than 400 watts, the extra watts required will come from conventional electricity sources. If the demand is lower than 400 watts, the excess will go to the national electricity distribution system.

The first 300 panels will be set up between November and December this year and the last 200 in January 2012. The CNFL will soon publish a report on the process for selecting suitable houses. According to Henry Solis, the Director of CNFL’s Innovation and Energy Sufficiency Department, the main aim of the project is to show people how they can contribute to prevent climate changes. He also hopes that the project will lead to a greater demand for electric cars.

“The cost of this equipment is still very expensive and hard to finance, but it is expected that in 3 years a new generation of affordable panels will be available,” Solis said.

CNFL is the second distributor within recent years to launch a pilot scheme on distributed generation. Instituto Costarricense de Electricidad (ICE) also started off its program in late 2010. ICE’s goal is to install 5 megawatt capacity wind-based generators, water, sunlight and biomass (waste). The plan includes many Costa Rican businesses and industries though the subscribers will pay for the cost of the equipment.


To read more on this story visit the Costa Rica News